Permission requests
If you want to make any changes, additions or alterations to your home you’ll need to ask for permission from us first.
Find out what you’ll need to do, the documents you’ll need, where to send your requests and some handy FAQs.
If you've been issued a starter tenancy or new build tenure, you can’t get permission to carry out any works until you’re either out of the defects period (for new builds) or have become an assured tenant (from starter tenancy).
Some requests may need an inspection. If yours does, we’ll make an appointment following your request.
Works that don't need permission
| Painting walls |
| Wallpapering |
| Laying carpet |
| Washing lines in private gardens |
| Smart meters |
| Sky dishes (houses only, not flats) |
Works that aren't allowed
| External air conditioning units | Dropped kerbs |
| Artexing walls/ceilings | Alterations/additions to fire doors (including disengaging fire door closers) |
| Screening on balconies (or anything that'll cause an obstruction) | Alterations/additions to gas supply (including removal of supply pipes) |
| Car ports | Garages on driveways |
| Cat/dog flaps | Home extensions |
| Ceiling tiles | Wood panelling on internal walls |
| Conservatories | Laminate flooring in flats |
| Loft boarding/conversions/extensions | Log burners/open fires |
| Garden ponds | Room conversions to create extra bedrooms |
| Solar panels | Tile painting |
| Building walls to divide rooms | Knocking down walls/chimneys |
| Wrap/repaint kitchen units | Items in communal hallways (including hanging baskets to ceilings) |
Make a request
You need to include in your request:
- Details of the work being considered
- Photos
- Drawings
- Proposed contractor details (name, public liability insurance, qualifications, certifications etc). If electrical works are part of the request, the contractor must provide the relevant certification.
- If planning permission's needed from the local authority, Highways or other agencies, you must get this independently and provide proof of permission to us.
Send your request to:
Post: Golding Homes, County Gate One, Staceys Street, Maidstone, ME14 1ST
Telephone: 0300 777 2600
In person: We'll pass your request onto the relevant team
What's next?
- If your permission request's approved, you’ll need to pay for all costs and you’ll need to make your own arrangements for appointing a qualified contractor.
- We’ll send you a letter of consent tailored to your request.
- You’ll need to confirm that you’ll comply with the terms of the letter by signing and returning the Tenant Acceptance Declaration. Once we get the signed declaration, a final consent email or letter will be sent, and a copy held on your account file.
- If permission’s denied we'll get in touch to let you know the reason.
- Any work carried out without permission could be a breach of your tenancy agreement and you might be asked to reinstate your property back to its original condition at your own cost.
Frequently asked questions
Will you carry out the work for me?
No, we won’t carry out any work that isn’t our responsibility. You'll need to find your own contractor.